
New TopShim run:

version = topshim 2.1.0
date = 2024-01-21
time = 21:35:30.295
command = topshim 

FINE SHIMMING

Parameters:

probe = Z163739_0168
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 1.6 Hz, Target= 0.6 Hz, After= 1.4 Hz
Iteration 2: FWHM Before= 1.4 Hz, Target= 0.6 Hz, After= 0.7 Hz
Iteration 3: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.5 Hz
Iteration 4: FWHM Before= 0.5 Hz, Target= 0.6 Hz, After= 0.7 Hz
Iteration 5: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.9 Hz
Iteration 6: FWHM Before= 0.9 Hz, Target= 0.6 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.718

shim changes: 
Z	-2776
Z2	-564
Z3	-1535
Z4	-4361
Z5	-3099
Z6	-10902
Z7	-27850
Z8	-7036

duration = 1 min 59 sec
completed successfully
finished Sun Jan 21 21:37:27 2024


========================================================================
